RESEARCH THAT SHOWS ITS WORK

Less research to do.
More evidence to decide.

Choose the question you need answered.
One purchase per parcel and saved plan. No subscription required.

Screen
$29one time

What should I know about this parcel?

Check my parcel
  • Current parcel and environmental checks
  • Separate wastewater, water and access investigations
  • Evidence, consequential gaps and downloadable PDF
When this report is available

A confirmed parcel boundary and working environmental screening sources.

Mapped screening does not establish zoning permission, current septic condition or utility capacity.

Development
$399one time

How do development options and site costs compare?

Check my parcel
  • Everything in Feasibility
  • Evaluated development alternatives and lot layouts
  • Routed quantities, cost scenarios and decision comparisons
When this report is available

Feasibility capabilities, applicable road evidence and validated subdivision rules.

Layouts are concepts. Engineering quantities, title, discretionary approvals and unpriced work keep their stated limits.

FROM A QUESTION TO A RESEARCH RECORD

Your report works while you get on with your day.

Follow the actual investigations, source reads and evidence checks in your report. No SitePrep reviewer is required for these products.

  1. 01
    Confirm the parcel and scope.

    SitePrep checks the required capabilities and explains known source limitations before checkout.

  2. 02
    Research starts after confirmed payment.

    Investigations retrieve and match available public records. Progress reflects real work, with retryable source failures kept separate.

  3. 03
    Open the evidence and next steps.

    Read the delivered report, citations and PDF. Unsupported permissions remain unknown; an incomplete purchased scope is shown explicitly.

New England first. Checked at the parcel level.

Maine, New Hampshire, Vermont, Massachusetts, Rhode Island and Connecticut are the current rollout. Not every municipality or proposed use has the evidence required for every product. SitePrep checks your property's capabilities before accepting an order. Field tests, surveys, engineering designs and permit decisions remain separate.

See a fictional sample
Already purchased a historical reviewed report?

Your order retains its original name, review commitment and documented scope. A new automated Development study does not replace a historical Verified review. Contact support with your order reference for fulfillment questions.