ILLUSTRATIVE SAMPLESitePrep
YOUR NEXT CHAPTER

Your field guide

Start with the landscape. Shape a plan. Follow the evidence.

A sample you can shape.

Fictional parcel, terrain and evidence. The map, scenario editor, floor-plan builder and report cards are the same components used in your private workspace.

Find a real parcel ↗
VT · ILLUSTRATIVE PARCEL

A little room to imagine.

Woodland setting · approximately 3 acres · parcel size stays fixed

Working concept
INTERACTIVE SAMPLEYour practice plan
Autosaved in this browser tabSign in to save workspace plans and create versions.
MAKE ROOM FOR YOUR LIFE

Your plan, on the land.

Interactive sample
One model. Every detail connected.
Opening the parcel studio…
3,000living sq ft · all floors
1,500house footprint sq ft
2,076house + garage sq ft
2,076building + amenities sq ft
Fictional parcel and terrain for exploration

Parcel area stays fixed. Living area spans all stories; site cover includes the garage, pool and deck. The site development model below measures driveway, clearing and infrastructure separately. The saved report evaluates its own frozen scenario.

Start with a way of living
DESCRIBE A POSSIBILITY

A brief becomes a reviewable program.

Describe the home and outdoor life you have in mind. Review the proposed dimensions before changing your plan.

AI drafting runs in an authenticated workspace. Here, explore the matching example program.

Open your workspace ↗
THE NEXT QUESTIONS TO RESOLVE

Make the unknowns visible.

  • House: reviewed setbacks, height, lot coverage and any environmental exclusions.
  • Garage: accessory-structure rules, driveway access and turning space.
  • 4 bedrooms: water supply and approved wastewater capacity.
  • Site cost: scoped local quotes for earthwork, utilities and access—not a national average.

A sourced report checks component geometry against available reviewed rules and records missing evidence. The visual preview alone does not establish buildability.

THE WORK BETWEEN ROAD & HOME

Site development model

Move the house. Keep the road connection. See what changes.

Review the assumptions
149 ftdriveway centerline
0.21 acassumed wooded clearing
54 yd³aggregate base
10.1%maximum modeled grade
Access & clearing

Clearing measures the union of the work areas and access corridor on a 3.0 ft grid. Wooded share is your assumption; trees shown in the sample are fictional.

Wastewater & well planning

These editable values are planning assumptions, not municipal rules. A soil evaluation, actual loading rate, seasonal water table, slope, neighboring wells and written approval determine design. Disabling an onsite system does not establish sewer or water service.

Driveway ground profileRoad · 0 ftGarage · 149 ft340335

Green: ground · dashed: concept grade. Elevations in ft; vertical scale enlarged. Source grid 12 m. Gross concept cut 0 yd³ / fill 171 yd³; no shrink/swell, foundation excavation or rock allowance.

ILLUSTRATIVE RATES · EDIT BEFORE RELYING$37,597–$91,826

Modeled site-work range, including 20% contingency. Excludes house construction and unmodeled work.

Work itemQuantityModeled range
Clearing & grubbing0.21 acre$619–$1,857
Aggregate base, placed54 cu yd$2,430–$4,590
Concept cut + fill handling171 cu yd$2,053–$5,132
Utility trench allowance149 linear ft$3,729–$10,442
Septic system allowance1 system$12,000–$30,000
Well allowance1 well$8,000–$18,000
Mobilization1 project$2,500–$6,500
Edit unit rates & contingency

Defaults are authored illustrative allowances, not government prices or contractor quotes. Editing a rate records it as your scenario assumption. Installed aggregate includes placement; earthwork covers additional grade changes, not aggregate placement.

Clearing & grubbing / acre
Aggregate base, placed / cu yd
Concept cut + fill handling / cu yd
Utility trench allowance / linear ft
Septic system allowance / system
Well allowance / well
Mobilization / project
Conflicts & required verification
?
Road entrance & access rights

Entrance is an assumed point on the south boundary. Place it on the actual permitted road connection before relying on this route.

·
Driveway route

A conceptual centerline avoids modeled buildings, pool, primary and reserve disposal areas. Turning radii, shoulders and swept paths need design.

·
Driveway corridor and parcel

Sampled full-width driveway and apron fit within the mapped parcel, except the entrance approach. Survey and access rights remain unresolved.

·
Driveway grade

10.1% maximum modeled grade; 12% user planning target. 12 m terrain cannot establish final engineering grades.

·
Buildings and amenities / parcel

Sampled component edges fit within the mapped boundary; local setbacks and exclusions require the evidence check.

·
Disposal areas kept clear

Modeled structures and driveway avoid the disposal and reserve areas.

·
Disposal area boundary

Field and reserve outlines fit inside the mapped parcel; setbacks remain unverified.

·
Tank access and structures

The concept tank is clear of modeled buildings and driveway; service access and approved location remain to verify.

?
Soil testing & wastewater approval

600 gallons/day ÷ 0.6 gpd/sq ft = 1000 sq ft planning area, plus 100% reserve. These are editable assumptions, not an approved system.

·
Well / disposal separation

217 ft to the nearest disposal edge; 100 ft user assumption. Applicable local separation and well yield remain unverified.

?
Drainage, rock & retaining work

Culvert sizing, stormwater, rock excavation, retaining walls, import/export, design fees and permits are excluded from this model budget.

FROM POSSIBILITY TO EVIDENCE

See what the report asks next.

Check the whole program against the parcel, then turn unknowns into specific written confirmations.

Explore the report preview